One Canada Square, Canary Wharf

About this project

An iconic part of the London skyline, One Canada Square reaches 770 feet above ground level, making it the third tallest building in the UK. The construction of this skyscraper was finished in 1991. The building was designed by César Pelli with Adamson Associates.  Frost Drainage products were used within the construction of the building offering a long-lasting solution. 

Products used

Cold roof medium-duty drain assembly spigot outlet View Product

Floor drain 150mm circular stainless steel grating medium sump P trap spigot outlet View Product

Floor drain 150mm circular nickel bronze grating large deep sump body threaded outlet View Product

Floor drain 150mm stainless steel grating large sump body spigot outlet View Product

Floor drain 200mm circular ductile iron grating small sump body spigot outlet View Product

Similar Projects

Get in touch

Quam enim et dicimus tibi satis quid flagitiosum istud. Quis arcesilas potius erit consectetur aliquid.