GetJar Plaistow Project
Case study Case Study

Getjar choose Frost balcony outlets

Frost roof and floor gullies were chosen by Getjar to be used on their project, Plaistow Hub, as a cost-effective alternative. Known for its quality, price and service, Frost is the preferred choice of outlet for Getjar on all their projects.

The Plaistow Hub, E13 is a large project providing 182 new homes and a new library, gym, supermarket and cafes.  This is split between two buildings ranging from 15 to 23 floors.  Over 200 Frost outlets were installed on this project with the majority being balcony outlets.  Other types of outlets were used to suit cold roof applications and parapets.  Frost worked with the architect and engineers to provide the best solution for the drainage outlets.

Plaistow Hub during construction - Getjar Frost Case Study
Plaistow Hub
Plaistow Hub Construction